Interactive demonstration
Multi-Agent Coordination
Allocate tasks to specialized agents with limited capacity at minimum total cost, and measure how far a greedy first-come rule is from the exact optimum.
Purpose
Allocate tasks to specialized agents with limited capacity at minimum total cost, and measure how far a greedy first-come rule is from the exact optimum.
Variables
- cijcost of doing task i with agent j
- xij1 if task i is assigned to agent j
- n, mnumber of tasks and of agents
- kcapacity of each agent, k = ⌈n/m⌉
Assumptions
- Costs are random integers from 1 to 9 generated from the seed.
- Every agent can take at most k tasks.
- All tasks are known up front and costs add up.
Model
Data this would need in practice
- Real cost per task-agent pair (time, error rate, price) estimated from history.
- Real capacities and working hours.
- Task arrival rates, if tasks do not all arrive at once.
Interpretation
The gap is the price of the simple rule. A small gap says the rule is good enough; a large one justifies coordination. Change the seed to see that the gap varies from case to case.
Limitations
- Static assignment ignores tasks that arrive later.
- The result is optimal only for these synthetic costs.
- Dependencies between tasks are not modeled.